Dangerous Goods Transport (ADR)
The law requires that the removal and transport of dangerous goods must be done under the regulations of ADR, as set out in ADR 2023. An ADR vehicle load is defined as the transport of any materials on the road[...]
read moreThe Waste Hierarchy
Waste producers are required by law (Waste (England and Wales) Regulations 2011) to apply the “Waste Hierarchy”, a ranked list of options to reduce the environmental impact of waste. At Pegasus we have considerable experience in helping our customers in[...]
read moreCase Study: Waste Compound Design
Customer Overview Automotive parts manufacturing company, South West Relocating to a larger, purpose built site Requirements Remove all remaining waste from original site Advise on new waste compound design Assist in the set up of good working practices for waste[...]
read moreCase Study: Industrial Bund Demolition
Customer Overview Plastic Moulding Company, South Wales Site contained bunded area for the storage of bulk styrene based resin and organic peroxide hardeners Permitted site by Environment Agency and client Requirements Clear bunded area Decontaminate bunded area Produce samples and analysis[...]
read moreCase Study: Waste Transfer Station, Integrated Facility
Customer Overview Large military port, with associated repair and overhaul industrial facilities Long term customer of over 10 years Operating an on-site hazardous Waste Transfer Station with an Environmental Permit Requirements Operate and manage on-site hazardous Waste Transfer Facility Advise and[...]
read moreCase Study: Laboratory Clearance
Pegasus Waste Management supported one of its regular clients, a large university in the South West with an extensive refurbishment and modernisation of its science laboratories. The task involved the decommissioning of laboratory equipment as well as listing, packing and[...]
read moreCase Study: University Laboratory Pipework Removal
Pegasus Waste Management performed the removal and disposal of contaminated glass pipework for a university that was undergoing an upgrade to its teaching laboratories. The task required a proactive approach to ensure the project was completed in a timely manner[...]
read moreCopyright 2022 Pegasus Waste Managament | Website Admin | Privacy Policy